Summary

On 28 September 2003, a single high-voltage line fault (400 kV) triggered a cascade across the peninsula: overloaded parallel lines tripped, leading to widespread loss of power that affected nearly all of Italy for ~12 hours, plus outages in parts of Switzerland. :contentReference[oaicite:14]{index=14}
The blackout disrupted transport (metro, trains), communications, essential services and evacuees in major cities — demonstrating how interdependent national infrastructure networks can collapse from a single failure when redundancy and control are insufficient. :contentReference[oaicite:15]{index=15}

Systemic Features

  • Interdependent networks: power grid tightly coupled with communications & transport infrastructure — failure in electricity supply cascaded across many sectors.
  • Lack of redundancy and overload propagation dynamics — when one line failed, alternate paths were overloaded and could not hold, triggering collapse. :contentReference[oaicite:16]{index=16}
  • Network-scale fragility: the national grid was so interconnected that local faults propagated fast across long distances.

Cascading Systems Affected

  • Energy supply
  • Public transport (metro, rail)
  • Communications / signalling
  • Economy — businesses, public services, city life

Impacts

  • Widespread blackout across Italy; metro trains stranded underground; 30,000 people left stuck in trains overnight in Rome. :contentReference[oaicite:17]{index=17}
  • Transport system paralysis — trains cancelled, commuters stranded. :contentReference[oaicite:18]{index=18}
  • Social disruption, lost economic activity, temporary collapse of urban services overnight.

Further Reading / Sources

  • Official report of the 2003 Italy blackout; network-dynamics analyses of cascading grid failure. :contentReference[oaicite:19]{index=19}